Cutting-edge InfoGraphics, Automation, Testing, Simulation and Programming Solutions.

The Fast Lane to Business Success Starts with Smart Software. Let Us Get You & Your Projects Front Seats on the Rocket Ship. Scroll down for a demo.

An all-round Building Management Software Solution

SVG

In a world of Data we challange the limits of Data Visualizatiion.

Portfolio

Overview

Dashboard

Analytics

Capital Forecast

Market Trends

Occupancy

Tenants

Maintenance

Notifications

Settings

For Property Owners and Managers

Building S

Building Energy Efficiency Rating

A | 95

Chart
ChartChart
Operating Costs

$35,000

/$50,000

Occupancy

92% Occ

/4 Vac

Compliance & Risk Status | Latest
Building 1
Building 2
Building 2

Fire Safety

Up to Code

Inspection Needed

Up to Code

Elevator Status

Minor Malfunction

Fully Operational

Minor Malfunction

Electrical Inspections

Check Report

All Systems Normal

All Systems Normal

Sprinkler System

Needs Pressure Test

Functional

System Failure!

Gas Leak Detection

Leak Detected!

No Issues

No Issues

Property Tax Compliance

Delinquent!

Paid

Payment Due Soon

Building Code Compliance

Pending Minor Fixes

Compliant

Major Violation!

HVAC System Status

Optimal Performance

Efficiency Drop

Optimal Performance

Energy Efficiency Compliance

High Energy Usage

High Energy Usage

Meets Standards

Cybersecurity Status

Unauthorized Attempts

Data Breach!

Secure

Water Quality Monitoring

Needs Testing

Safe to Use

Contaminated!

Structural Integrity

Stable

Structural Risk!

Cracks Detected

Backup Power Status

Backup Offline!

Low Battery

Testing Mode

Data Security

System Vulnerable!

Access Issues

Data Encrypted

City Compliance Violation

Building 1: $15,000 fine issued for code violation

Property Tax Delinquency

Bldg 2: Outstanding balance of $250,000 due in 10 days

Audit Cleared

All properties passed IRS review with no penalties

Pending Legal Action

Tenant lawsuit filed in Building 3 for lease dispute

Upcoming City Inspection

Fire safety audit scheduled for next week in Bldg 4

High-Risk Lease Expiration

Luxury tenant in Penthouse 52B considering moving out

Capital ForecastChart

For Building Operators

Building X

Dashboard

Equipment

Maintenance

Work Orders

PM Schedules

Analytics

Integration

Notifications

Settings

HVAC Failures

Week 5(-37.5%)

Month 12(-37.5%)

Leaks

Week 2 (-40%)

Month 18 (-20%)

Utilities

Electricity ↓5%

Gas ↓25%

Systems Health

Boiler eff. +4%

Elevator dt. -10%

Open W.O.

Total 7

Sub Cont. 2

Building X

Building Energy Efficiency Rating

A | 95

beer
Work Orders & Preventive Maintenance
ID / TaskCategoryStatusPriorityAssigned ToDeadline
Work Orders
WO-001HVACOpen

Urgent

J. Doe2025-03-20
WO-002PlumbingIn Progress

High

J. Smith2025-03-22
WO-003ElectricalCompleted
-

Medium

M. Johnson2025-03-18
Preventive Maintenance
Boiler ServiceCompleted
-

N/A

M. Johnson2025-03-15
HVAC FiltersDue Soon

High

J. Smith2025-03-25
Fire InspectionOverdue

High

N/A2025-03-10
Total: 6 Items
Work Orders & Budget Timeline

Start (0%)

Mid (50%)

End (100%)

Work Order #1

Planned vs Actual Cost: $5,000 vs $5,500

Work Order #2

Planned vs Actual Cost: $2,500 vs $3,000

Overall Budget (Maintenance)

Planned vs Actual Cost: $10,000 vs $12,000

Water Leak Detected

Leak in Basement Level 2 near boiler room. Immediate action required.

HVAC System Failure

Chiller Unit 5B offline. Cooling capacity reduced by 30%.

Fire Safety Alert

Sprinkler system malfunction on Floor 7. Inspection required.

Power Outage

Partial power loss in Building 2. Emergency generator active.

Urgent Elevator Repair

Elevator #3 stuck between floors. Technician en route.

Electrical System Overload

Breaker tripped on Main Panel A. Investigation needed.

Boiler System Passed Inspection

Routine maintenance completed. No issues detected.

Upcoming Maintenance

Scheduled HVAC filter replacement for all air handling units in 3 days.

Capital ForecastChart

Orientation

Equipment Process